design professional
An architect or engineer, or both, duly licensed for professional practice, who may be employed by an owner for the […]
An architect or engineer, or both, duly licensed for professional practice, who may be employed by an owner for the […]
On a public works project, the maximum number of people for whom the project is designed.
An early phase of work on a building project in which the design of the project is laid out; usually
The number of people and/or activities for which an environmental system has been designed.
1. The total load on a structural system for the worst combination of loads and forces which it is designed
The period of time over which a building component or structure is required to perform safely, with an acceptable probability
The second phase of the architects basic services. In this phase the architect prepares (from the approved schematic design studies,
A classification rating that indicates the level of resistance to fatigue of a building component.